The new Davenport Kraft plant was built in 2017 to replace an aging facility located by the Mississippi River. Climate installed the HVAC system including ductwork, rooftop units, make-up air units and exhaust fans. Much of the ductwork had to be coordinated to be above the USA insulated ceiling and had to be fabricated from stainless steel. We also had to utilize a helicopter to set over 70 pieces of roof-mounted equipment.